This week much was accomlpished. The aircon was fixed up on Mon. The toilet bowls, shower sprays, heater, ceiling lights, fans and parts of the kitchen cabinets were all done up. Next week, the laminated flooring will be installed on Mon and Tue. By Fri, the kitchen cabinets, wardrobe, study desk, doors, show cabinet and TV console will be up. On Fri, I am taking delivery of my Dunlpoillo mattress, LG fridge and washer, paintings for dining hall and bedroom, beddings from Robinsons.
Saturday, February 21, 2009
21 Feb 2009
This week much was accomlpished. The aircon was fixed up on Mon. The toilet bowls, shower sprays, heater, ceiling lights, fans and parts of the kitchen cabinets were all done up. Next week, the laminated flooring will be installed on Mon and Tue. By Fri, the kitchen cabinets, wardrobe, study desk, doors, show cabinet and TV console will be up. On Fri, I am taking delivery of my Dunlpoillo mattress, LG fridge and washer, paintings for dining hall and bedroom, beddings from Robinsons.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment